Project cargo and heavy lift

Recuperator 2 (RC-2), Bogor to Muntok

An oversized, overweight Recuperator 2 at 22 tons per unit, hauled by dolly trailer from the factory in Bogor to Sunda Kelapa port for shipment to the project site in Muntok, Bangka Belitung.

Recuperator 2 being prepared and wrapped at the Bogor factory
Cargo
Recuperator 2 (RC-2)
Origin
Bogor, West Java
Destination
Muntok, Bangka Belitung
Transport mode
Road (dolly) + sea
Documented
March 2024
Operation data

Key figures

Dimensions
919 × 417 × 433 cm
Weight
22 tons per unit
Fleet
Dolly, 12-metre chassis
Payload capacity
55 tons
Lifting equipment
Factory hoist crane
Port of loading
Sunda Kelapa, Jakarta

Stage by stage

19 photos from the operation. Select a photo to view it full size.

  1. 01

    Cargo preparation at the factory

    The RC-2 measures 919 × 417 × 433 and weighs 22 tons per unit. Transport was matched to the cargo's size and weight: a dolly trailer with a 12-metre chassis and a 55-ton payload.

    Recuperator 2 being prepared and wrapped at the Bogor factory (1/7)Recuperator 2 being prepared and wrapped at the Bogor factory (2/7)Recuperator 2 being prepared and wrapped at the Bogor factory (3/7)Recuperator 2 being prepared and wrapped at the Bogor factory (4/7)Recuperator 2 being prepared and wrapped at the Bogor factory (5/7)Recuperator 2 being prepared and wrapped at the Bogor factory (6/7)Recuperator 2 being prepared and wrapped at the Bogor factory (7/7)

    Original post on Instagram

  2. 02

    Loading onto the dolly trailer

    The RC-2 was loaded onto the dolly trailer using the factory's hoist crane. With a 22-ton load, the crane's rated capacity had to exceed the weight being lifted.

    Recuperator 2 lifted by hoist crane onto the dolly trailer at the factory (1/5)Recuperator 2 lifted by hoist crane onto the dolly trailer at the factory (2/5)Recuperator 2 lifted by hoist crane onto the dolly trailer at the factory (3/5)Recuperator 2 lifted by hoist crane onto the dolly trailer at the factory (4/5)Recuperator 2 lifted by hoist crane onto the dolly trailer at the factory (5/5)

    Original post on Instagram

  3. 03

    Factory to port

    The road leg from Bogor to Sunda Kelapa port had to clear several obstacles: pedestrian bridges, underpasses, and street markets spilling onto the road.

    Recuperator 2 on the dolly trailer en route to Sunda Kelapa port (1/7)Recuperator 2 on the dolly trailer en route to Sunda Kelapa port (2/7)Recuperator 2 on the dolly trailer en route to Sunda Kelapa port (3/7)Recuperator 2 on the dolly trailer en route to Sunda Kelapa port (4/7)Recuperator 2 on the dolly trailer en route to Sunda Kelapa port (5/7)Recuperator 2 on the dolly trailer en route to Sunda Kelapa port (6/7)Recuperator 2 on the dolly trailer en route to Sunda Kelapa port (7/7)

    Original post on Instagram

Related service

Project Cargo & Heavy Lift

End-to-end management for heavy equipment, industrial machinery, steel piles, and project structures. Road transport, barges, and crane lifts coordinated under single oversight to site.

View service

Discuss a similar project

Send the cargo dimensions, weight, route, required date, and site conditions for an initial assessment.

Request a Project Quote