Marine and barge
Steam coal barge voyage, Lematang to Lamongan
One voyage of TB. SPAJ 031 and BG. Zulkifli 11 carrying 7,405.410 MT of Indonesian steam coal from Jetty SDJ Lematang, South Sumatra, to Jetty Shore Base Lamongan, East Java. Every stage was reported from the field, from barge preparation to discharge.

- Cargo
- Indonesian steam coal
- Origin
- Jetty SDJ Lematang, South Sumatra
- Destination
- Jetty Shore Base Lamongan, East Java
- Transport mode
- Tug and barge
- Documented
- August – September 2026
Key figures
- Tug boat
- TB. SPAJ 031
- Barge
- BG. Zulkifli 11
- Total cargo
- 7,405.410 MT
- Capacity
- ±7,500 MT
- Port of loading
- Jetty SDJ Lematang
- Port of discharge
- Jetty Shore Base Lamongan
Stage by stage
16 photos from the operation. Select a photo to view it full size.
- 01
Cast off from Sungai Lilin
At 17.30 WIB the tug and barge cast off from the Simpang 3 Tungkal mooring, then went full away at 18.00 WIB towards Jetty SDJ Lematang as the first leg of the voyage to Jetty Lamongan Shore Base.
- 02
En route to Jetty SDJ Lematang
The tug and barge sailed towards Jetty SDJ, Lematang, passing the Musi River bridge in Palembang ahead of loading.
- 03
Barge cleaning
BG. Zulkifli 11 was cleaned thoroughly before loading so the cargo area was clean, safe, and ready for use.
- 04
Loading at Jetty SDJ Lematang
Indonesian steam coal was loaded onto BG. Zulkifli 11 by conveyor at Jetty SDJ Lematang, South Sumatra, with a capacity of ±7,500 MT bound for Jetty Lamongan Shore Base.
- 05
Full away from South Sumatra
With loading complete, TB. SPAJ 031 and BG. Zulkifli 11 went full away from Jetty SDJ Lematang towards Lamongan, with coordination and handling integrated from loading to delivery.
- 06
Cast off from Pulau Senggeris
After mooring in the Pulau Senggeris area to wait for a calm high tide, the tug and barge cast off at 13.30 WIB and continued the voyage with a total cargo of 7,405.410 MT.
- 07
Position update off Pati
At 08.17 WIB the convoy was abeam Pati at 06°23'797"S / 111°11'817"E, making ±1.6 knots with ±79.8 NM to go and an ETA of 15 September 2026.
- 08
Anchoring at Tanjung Pakis
The convoy arrived and anchored at Tanjung Pakis, Shore Base, Lamongan, waiting in the queue to berth and discharge at Jetty Shore Base.
- 09
Berthing at Jetty Shore Base
After waiting for readiness and the berthing queue, TB. SPAJ 031 and BG. Zulkifli 11 completed berthing at Jetty Shore Base Lamongan, ready for cargo handling.
- 10
Cargo discharge
Cargo discharge ran at Jetty Shore Base Lamongan with excavators and a dump truck fleet keeping the operation safe, coordinated, and steady.
Sea Freight, Container & Barge
Reliable maritime transport: Full Container Load (FCL), Less than Container Load (LCL), breakbulk vessels, and tug-and-barge convoys for bulk commodities and heavy materials.
View serviceMore operations

30-metre steel piles, Cilegon to Tanah Bumbu
Cilegon, Banten → Tanah Bumbu, South Kalimantan

Recuperator 2 (RC-2), Bogor to Muntok
Bogor, West Java → Muntok, Bangka Belitung

Steel pipe charter flight, Jakarta to Balikpapan
Jakarta → Balikpapan, East Kalimantan
Discuss a similar project
Send the cargo dimensions, weight, route, required date, and site conditions for an initial assessment.